ONYX SELCHP
THE SITUATION
ONYX SELCHP operates and maintains the South East London
Combined Heat and Power plant which burns household waste as fuel. In
1994, the company experienced problems with specialist vertical reeling
cables for the electro-hydraulic grab which is at the core of the operation's
process. Downtime at this point cannot be tolerated because the plant
itself would have to be shut down.
THE SOLUTION
Elmeridge Cables was recommended to the Electrical Control
and Instrumentation Engineer at SELCHP responsible for the grab, which
is hoisted up and down a 40-metre drop, with the vertical reeling cable
used both for powering and controlling the mechanism. To meet this application,
Elmeridge was able quickly to supply multi-core cable of the required
strength, with service backed up by a director of the company.
THE RESULT
No cable problems have arisen since
Elmeridge was appointed and, although specification was critical, Elmeridge
has also proved price-competitive. "Elmeridge provide a flexible
and friendly service, know what they are talking about - and solved the
problem," comments SELCHP's EC&I Engineer.

|