Elmeridge at Oceanolgy 2000
Elmeridge assembles top global
team for OCEANOLOGY international 2000
Elmeridge Cables Ltd exhibited at the Oceanology International
2000 Exhibition at the Stakis Brighton Metropole Hotel, Brighton
Joining the Elmeridge Cables team
on Stand at OI 2000 were two major figures from the international
cabling industry. Cal Peters, with 25 years at Californias South
Bay Cable Corp and now its Chief Engineer, is well known for many
impressive successful projects. These include the US Navy submarine
test range communication cabling in Alaska, where 10km of 40mm OD
bottom-laid cable was installed, and the Aerostat surveillance balloon
tether cable, with 80,000 lbs breaking strain, reaching 30,000 feet
into the atmosphere.
Technical Manager, Roberto Giudici who has worked
in Europes leading customised cable maker, Novacavi, for over 15
years. He has made his name in breaking new ground in many fields,
among them umbilical marine cables, flexible cables for drag chains
and radiation-resistant cables utilising Kapton. |
 |
Elmeridge Cables selected
OI 2000 to introduce its new comprehensive undersea cabling services,
comprising diagnosis, design and manufacturing, plus its pan-European
alliance with South Bay Cable Corp, to add to Elmeridge's partnership
with Ericsson Cables AB.
|
The Elmeridge stand
design was a radical departure for subsea exhibitions, incorporating
a large water feature animated by movement, light and colour. Applications
on display included power/voice/data/image transmission and mechanical/mobile
uses.
|
|
|